myclients: Manchester High School For Girls

The Challenge

When one of the country’s leading girls’ schools decided to invest in developing their food technology laboratory, one of the prime objectives was to maximise learning potential by creating a comfortable working environment for pupils and teachers alike. A top priority was to install an air conditioning system, and myclimate was tasked with providing a solution that combined flexible, energy-efficient performance, reliability, long service life and value-for-money.

 

The Solution

The myclimate solution comprised of two Daikin cassette units flush mounted to the ceiling, each featuring 4-direction air flow and adjustable louvers to ensure accurate distribution of the air flow. Extremely quiet in operation, these lightweight and compact units leave maximum wall and floor space.

Technical Summary

Equipment Fitted:
2 x Daikin 12.5kW round flow cassette inverter heat pump units

Approximate Cost:
£7,000 plus VAT

Return to Case Studies